Products 2017-05-30T17:16:13+00:00
Also available in 300 series.
See Technical detail.

BANCL190 for ‘Non-Centrally’
Located reinforcing steel

In masonry wall construction where the reinforcing steel is required to have 20mm of grout cover on the tension face of the wall, such as in a retaining wall, the BANCL190 BlockAid locates the horizontal reinforcing steel in the correct position during the wall construction. Once the block laying is completed, the vertical reinforcing steel bars can be inserted through the BlockAid in the correct location. BlockAid thereby ensures the location of the reinforcement in the wall meets the engineering specification.

The BANCL190 is also used to align Control Joint dowels.

BACL190 for ‘Centrally’
Located reinforcing steel

In wall construction where the reinforcing steel is required to be located centrally in the wall, such as in factory walls, the BACL190 BlockAid locates the horizontal reinforcing steel in the correct position during the wall construction. Once the block laying is completed, the vertical reinforcing steel bars can be inserted through the BlockAid in the correct central location. BlockAid thereby ensures the location of the reinforcement in the wall meets the engineering specification.

onesteel_logo

Available through Onesteel

The BlockAid range provides for precision in determining reinforcing locations of the steel bar and ensures the construction of a reinforced concrete block wall using masonry or besser blocks will always meet the Australian Standard. BlockAid is not suited to mortarless or hebel blocks.