for Non-Centrally Located reinforcement:
Locates the horizontal reinforcement in the correct lateral position during construction and provides for the vertical reinforcement to be inserted through the BLOCKAID to ensure the structural integrity of the wall is achieved. Also used to align the Control Joint dowels.