• for Centrally Located reinforcement: Locates the horizontal reinforcing steel in the correct lateral position during construction and provides for the vertical reinforcement to be inserted through the BLOCKAID in the centre of the core to ensure the structural integrity of the wall is achieved.
  • for Non-Centrally Located reinforcement: Locates the horizontal reinforcement in the correct lateral position during construction and provides for the vertical reinforcement to be inserted through the BLOCKAID to ensure the structural integrity of the wall is achieved. Also used to align the Control Joint dowels.
  • for Centrally Located reinforcement: Locates the horizontal reinforcing steel in the correct lateral position during construction and provides for the vertical reinforcement to be inserted through the BLOCKAID in the centre of the core to ensure the structural integrity of the wall is achieved.
  • for Non-Centrally Located reinforcement: For use with 290mm blocks (Jumbo Blocks) to locate the horizontal reinforcement in the correct lateral position during construction and provides for the vertical reinforcement to be inserted from the top to the bottom of the wall to ensure the structural integrity of the wall is achieved. Works in conjunction with the 190mm BlockAids so the vertical reinforcement is able to be inserted through the BANCL190 in the 190mm blocks and align with the BANCL290 in the 290mm blocks.
Go to Top